Avantgarde Block A

Bethnal Green, London · Higher-risk building fire safety remediation

PROJECT OVERVIEW

Coordinating building safety remediation

Project
Avantgarde Block A
Location
Bethnal Green, Tower Hamlets, London
Department
Principal Contractor & BSR ↗
Building
Residential higher-risk building · basement, ground and seven upper floors
Building height
Approximately 21.3 m to highest occupied floor
Conex role
Building Regulations Principal Contractor, as stated in the project Construction Control Plan

Conex Limited prepared the Construction Control Plan for a residential fire safety remediation programme at Avantgarde Block A. The project addresses combustible materials associated with balcony decking and screens, with a coordinated approach to Building Regulations compliance, occupied-building safety and Gateway 2 documentation.

The planned scope includes removal of combustible timber and composite balcony decking, installation of non-combustible aluminium decking, and replacement of decorative and balcony divider panels with powder-coated aluminium sections. Existing balcony steelwork and fixings are to be inspected and verified before reinstatement.

This case study describes the documented project scope and delivery arrangements in the October 2025 Construction Control Plan; it does not represent confirmation of completed remediation or BSR Gateway approval.

CONSTRUCTION CONTROL PLAN

Safe delivery in an occupied building.

Building safety controls and traceable records integrated into the proposed construction methodology.

01

Resident communication

Planned notices, access coordination and maintained live building services throughout the remediation.

02

Temporary works & escape routes

Scaffold design coordination to preserve means of escape, building exits and fire-service access.

03

Quality & change control

Baseline inspections, product certification, documented site QA and formal review of changes against approved design.

04

Golden-thread evidence

Controlled drawings, inspection records, photographs and as-built information planned for Gateway 3 handover.