Conex Construction Experts

SPECIALIST DEPARTMENT / 03

Drylining & ceilings

Coordinated partitions, linings and ceiling packages

Partitions, plasterboard linings and ceiling works coordinated with the wider interior construction package.

Discuss your requirements ↗
Plasterboard walls and ceiling with taped joints before decoration
Plasterboard walls and ceiling before decoration
OverviewScope of servicesQuality & recordsYour project briefCommon questions

TECHNICAL UNDERSTANDING. PRACTICAL DELIVERY.

Coordinated partitions, linings and ceiling packages.

A successful interior starts beneath the surface. Conex provides drylining, partition and ceiling works for new construction and refurbishment, bringing practical installation experience to the framework, board build-up and finishing interfaces. We work to the project specification and coordinate openings and junctions with neighbouring trades.

Partitions and ceilings influence the appearance, use and performance of the finished space. The framework, board layers, junctions and service openings need to work together as a specified system. Conex approaches the package as part of the wider interior sequence, coordinating with doors, services and subsequent finishes.

SCOPE OF SERVICES

A defined package.
A coordinated approach.

The final scope is agreed against your specification, existing conditions and programme.

01

Partitions and wall linings

Set out the agreed layouts and coordinate the framework with door openings, fixtures and adjoining construction. Board types, layers and fixing arrangements follow the project specification.

02

Ceilings and bulkheads

Review levels, perimeter details, service zones and access requirements before installation. Ceiling works need to align with lighting, ventilation and the space required by the services above.

03

Preparation for finishes

Coordinate board joints, corners and interfaces with the plastering or jointing package. A consistent base helps subsequent decoration and reduces avoidable making good.

Department capabilities

  • Metal stud partition systems
  • Plasterboard wall linings
  • Suspended and MF ceiling works
  • Bulkheads, openings and junction details
  • Preparation for plastering and decorative finishes

QUALITY & COORDINATION

Attention to the details
that matter.

We review layouts, levels and specified system details before installation. Interfaces with services, doors and finishes are coordinated through the works, with the required acoustic or fire performance addressed through the specified construction rather than assumed from its appearance.

Working with other trades

Close coordination with mechanical and electrical services is important before boarding and ceiling closure. Door frames, floor build-ups, façade junctions and fixtures also need to be considered during setting out.

PROJECT CHECKPOINTS

  • Approved layouts, setting-out lines and finished levels
  • Specified board types, layers and framework arrangement
  • Junctions with floors, façades and adjoining partitions
  • Door openings, support requirements and service coordination
  • Access panel positions and inspection before closure
  • Surface readiness for the agreed finish

INFORMATION AT HANDOVER

Useful records.
Clear responsibilities.

The handover scope can include inspection information, confirmation of specified system references, relevant product information and records of agreed changes. The required documentation and any acoustic or fire performance evidence should be identified in the project brief.

PREPARING YOUR PROJECT BRIEF

A better brief.
A more useful proposal.

Share the information you have, including your site location and target dates. We can discuss the proposed works and identify the details needed to establish a clear package.

  • Partition and reflected ceiling plans
  • Specified system build-ups and performance requirements
  • Service coordination and access requirements
  • Door openings, finish details and programme
Enquire about drylining & ceilings ↗

COMMON QUESTIONS

Planning your works.

Do you provide partitions and ceilings as one package?

Tell us which elements are required. We can discuss the combined scope, installation sequence and interfaces with other trades.

Can you install specified fire or acoustic systems?

Share the approved system details and required performance. The complete build-up and its junctions need to be considered as part of the specification.

What is needed before ceilings are closed?

The required inspections, service coordination and access arrangements should be agreed during planning, so concealed work can be reviewed before closure.

RELEVANT PROJECT EXPERIENCE

Paragon Estate

Drylining, plastering, flooring and fire-door packages within a development of six blocks and more than 1,000 units.

Explore project
Paragon Estate aerial view during refurbishment

RELEVANT PROJECT EXPERIENCE

Oak Square

Ceiling opening-up and intrusive survey works across 256 apartments, planned around resident access and restricted site space.

Explore project
Oak Square residential building with pale cladding and dark brickwork