Offsite panel installation

Factory-made panels.
Carefully installed on site.

Installation of prefabricated wall panels, with setting out, alignment, connections and installation records coordinated as one package.

Discuss your requirements ↗
Steel-framed wall panels and openings during installation at Deepcut UniHouse
Deepcut – UniHouse · Installation in progress
OverviewScope of servicesQuality & recordsProject experienceYour project brief

OFFSITE COMPONENTS. ON-SITE DELIVERY.

Precision at the interfaces.

Conex installs prefabricated wall panels as part of a coordinated site package. Panel references, openings, base connections and adjoining components are considered together throughout installation.

Our work at Deepcut – UniHouse brings this approach into view: positioning panels, checking line, level and plumb, and recording the details as the works progress.

SCOPE OF SERVICES

A defined sequence.
Carefully checked details.

The installation package is agreed against the project drawings, panel schedules and system-specific requirements.

01

Panel identification & setting out

Review panel references and the installation sequence against the agreed layout. Coordinate positions, orientations and openings with the supporting structure.

02

Wall-panel installation

Position prefabricated panels and coordinate base and panel-to-panel connections. Check alignment at panels and openings as each area takes shape.

03

Inspection & records

Record panel identification, alignment and connection details during installation, keeping the inspection information connected to the relevant part of the works.

Department capabilities

  • Prefabricated wall-panel installation
  • Panel reference and QA identification
  • Setting out and opening coordination
  • Line, level and plumb checks
  • Base and panel-to-panel connection details
  • Installation inspection records

QUALITY & COORDINATION

Check as the
work progresses.

Panel identification, condition, alignment and connections are recorded during the installation sequence. Access and support arrangements are coordinated with the site team and the agreed installation requirements.

Clear installation information

Project drawings, the current installation manual and the agreed inspection plan establish the requirements for the package. Checks and records follow the relevant panel and location.

PROJECT CHECKPOINTS

  • Panel references and identification labels
  • Panel condition before installation
  • Panel position and orientation
  • Alignment at panels and openings
  • Specified base and connection fixings
  • Inspection evidence by location

RELEVANT PROJECT EXPERIENCE

Deepcut – UniHouse

Wall-panel installation within the plots 35–40 package at Princess Royal Barracks, Deepcut. Current project views follow the work at Plot 35.

Explore project
Panel installation at Plot 35, Deepcut UniHouse

PREPARING YOUR PROJECT BRIEF

Plan the package
around the system.

Share your panel schedules, drawings, site location and programme. We can discuss the proposed installation scope and the information needed to coordinate the works.

  • Panel layouts, references and installation details
  • Supporting structure and interface information
  • Access, delivery and installation sequence
  • Inspection requirements and programme
Enquire about offsite panel installation ↗